Airport Departure LED Displays
The plasma walls retired and the departures never noticed.
Navigation · Norfolk, VA
04/05/2025
NanoLumens — 2 × NovaStar KU20
Project Overview
Two new P2.5 LED departure displays replaced aging Planar plasma video walls at Norfolk International Airport. The screens provide a refreshed platform for content seen by travelers and advertisers.
System
Manufacturer: NanoLumens Displays: Two P2.5 LED walls Processing: 2 x NovaStar KU20 Existing system: Planar plasma video walls
Challenge
Although the displays were part of the same airport upgrade, each belonged to a different entity. Each required its own control room, network, and media player.
Execution
The project accounted for the separate control environments while replacing the existing plasma walls with LED displays.
Outcome
The airport received two new departure displays with independent control infrastructure.






