Hybrid LED Deployment In the House of Worship
Three displays. Two mounting approaches. One coordinated deployment around an active venue.
House of Worship · Mustang, OK
02/27/2024
Revelux — NovaStar MX40 Pro
Project Overview
Working with Revelux, we deployed three LED displays at an operating church in Mustang, Oklahoma. The installation combined permanent and rental-style systems within the same space, all at a 2.9 mm pixel pitch.
System
The system consisted of two wall-mounted hybrid LED displays positioned on either side of the room and a larger center display built as a rental-style ground stack. Using the same pixel pitch across all three displays maintained a consistent visual presentation despite the different mounting methods.
Challenge
Working inside an active church meant the installation schedule had to accommodate regular services and ongoing venue operations. Work windows were limited, requiring the crew to sequence installation, testing, and commissioning around times when the space needed to remain available.
Execution
The deployment was planned around the church's service schedule, with the crew moving between the wall-mounted systems and center ground stack to keep work progressing during the available windows. Coordination with Revelux and the venue allowed all three displays to be assembled, aligned, and commissioned without disrupting scheduled services.
Outcome
All three displays were delivered on schedule, creating a cohesive LED system while allowing the church to remain operational throughout the deployment.
Project Overview
Working with Revelux, we deployed three LED displays at an operating church in Mustang, Oklahoma. The installation combined permanent and rental-style systems within the same space, all at a 2.9 mm pixel pitch.
System
The system consisted of two wall-mounted hybrid LED displays positioned on either side of the room and a larger center display built as a rental-style ground stack. Using the same pixel pitch across all three displays maintained a consistent visual presentation despite the different mounting methods.
Challenge
Working inside an active church meant the installation schedule had to accommodate regular services and ongoing venue operations. Work windows were limited, requiring the crew to sequence installation, testing, and commissioning around times when the space needed to remain available.
Execution
The deployment was planned around the church's service schedule, with the crew moving between the wall-mounted systems and center ground stack to keep work progressing during the available windows. Coordination with Revelux and the venue allowed all three displays to be assembled, aligned, and commissioned without disrupting scheduled services.
Outcome
All three displays were delivered on schedule, creating a cohesive LED system while allowing the church to remain operational throughout the deployment.